PROJECTS
Ship Loader Luff Cylinder Replacement
Working against the elements and 2km off land with limited access, the Tidal team accomplished the works with time to spare.
WATU Fan Replacement
This project saw our project team replace an exhaust fan at a prominent underground mining operation in the Goldfields.
Reclaimer Luff Cylinder Change-Out
Significant engineering was required to ensure machine stability during change out. The reclaimer had a two-piece hinged boom.
Resistor Cabinet Platforms
The client required nine (9) separate platforms for rear access to established resister cabinets to allow safe and secure access.
Screenhouse Conveyor Upgrade
Conveyor required upgrading from 2,050 tonnes per hour to 3,000 tonnes per hour in order to meet current demand.
Salvage of Damaged Barge
The client’s vessel had sustained considerable cyclone damage to the hull and was partially submerged.
